This site is located in Hampole near Doncaster, and already has planning permission for the construction of a wind farm with four turbines.

The site would have a total capacity of 8.2MW and it’s expected to generate around 20,000MWh a year, nearly doubling the amount of electricity that Good Energy generates.

Although the site already has planning permission, we still plan to work with the local community to explore how the wind farm can benefit the area. The site will be eligible for Good Energy’s Local Tariff, which gives residents living near wind farms the opportunity to benefit from a separate electricity tariff which is 20% cheaper than our standard tariff in that region.

Project details

Proposed number of turbines:up to 4

Proposed total capacity: 8.2MW

Generation output: Expected to generate around 20,000MWh a year

Development Status: In progress