To join our Smart Generation scheme you will need to meet a few requirements. We cannot process your application unless all these requirements are met. Generators must:
- Be located in England, Scotland or Wales.
- Have permission from your local distribution company to connect to the local electricity grid.
- Be accreditable for or must have already applied for accreditation for ROCs, LECs, and REGOs.
- If you have an export meter fitted, it must be an industry standard settlement export meter, otherwise we will need to arrange for a settlement export meter to be fitted at your cost.
- Have the potential to export at least the minimum export threshold. This will be specified in the pricing offered.
- Hold and regularly check an email account for correspondence from Good Energy.
- Read and send monthly meter readings to Ofgem and Good Energy via email.
If you can meet these requirements, and would like to join our Smart Generation scheme, please go to How to Join.