commercial - General Requirements
switch to 100%

Or phone 0845 456 1640
and speak to a real person

General requirements

To join our commercial generation scheme, you must meet the following requirements:

  1. Generate electricity by a renewable technology based in England, Scotland or Wales.
  2. Be accreditable for or must have already applied for accreditation for ROCs, LECs, and REGOs. Please note that Good Energy does not currently assist with this process.
  3. Have a valid Export Meter Operation and Provision Contract in place.
  4. Read and send monthly export and total generation readings to Ofgem and Good Energy via email.
  5. Hold and regularly check an email account for correspondence from Good Energy.

If you can meet these requirements, and would like to join our Commercial Generation scheme, please go to Supplying Good Energy.